KeepOn Moving
KeepOn Moving
Fase 4. Mayo 2014 - Julio 2014
Phase 4. May 2014 - July 2014
En esta fase el proyecto experimenta con un nuevo sistema de convocatoria derivado del desconcierto provocado por el accidente vivido en fase anterior y las evidentes dificultades de seguir proceso de organización y ejecución de la obra solo con la herramienta on-line.
In this phase the project experiments with a new call-out system arising from the bewilderment caused by the accident lived through in the previous phase and from the evident difficulties of following the process of organising and carrying out the build with the on-line tool alone.
Los pasos y elementos significativos del proceso realizado en esta etapa son:
The significant steps and elements of the process carried out in this stage are:
- Cada evento (fin de semana: ejecución) se compondrá de otros tres eventos previos para preparar y organizar (lunes-miércoles-viernes).
- Integración de propuestas de diseño de personas que se acercan al proyecto en esta fase
- Integración de colaboración con asociaciones del Barrio: Casal d’Infants - Coop Impulsem
- Integración de colaboración con asociaciones dedicadas a la formación en bioconstrucción : Escola Origen - Terram (ejecución acabados de arcilla)
- Modificación diseño de fachada y estructura de cubierta
- Each event (weekend: build work) will be made up of three further prior events to prepare and organise it (Monday-Wednesday-Friday).
- Integration of design proposals from people who come to the project in this phase
- Integration of collaboration with neighbourhood associations: Casal d’Infants - Coop Impulsem
- Integration of collaboration with associations devoted to training in bio-construction : Escola Origen - Terram (execution of the clay finishes)
- Change to the façade design and the roof structure
- Inicio debates acerca de solicitud de ayuda/subvención al ayuntamiento de Barcelona
- Start of debates about applying for aid/a grant from the Ajuntament of Barcelona
La situación del proyecto en el momento de iniciar esta fase se puede definir como resultados de los eventos y procesos acontecidos en la fase anterior.En el més de Mayo sabemos que:
The situation of the project at the moment this phase begins can be defined as the results of the events and processes that took place in the previous phase.In the month of May we know that:
- Hay dificultad para personas en seguir el flujo de organización en plataforma On-Line Trello.
- Los criterios de participación y acceso a plataforma on-line no sestán claramente definidos.
- La gestión y control del almacén es esencial para la seguridad de la obra pero no disponemos de equipo fijo de personas que asuman responsabilidad de ello.
- La gestión de control de gastos y caja es esencial para seguridad del proyecto: disonemos de seguimiento eficaz de gastos realizados gracias a integración de datos gestionada por Vanessa Solano. Se empieza a tener caja con efectivos disponibles en el solar bajo responsabilidad de V.Maini y S.Sanz.
- Tenemos disponibilidad de empresas a donar materiales aislantes para cubierta (Foamglass) , impermeabilización fachadas y cubierta inclinada (Solitex de Germans Verdaguer) y acabado muros Greb y Tapial ( Livos Keim y ComCal)
- People find it difficult to follow the organisation flow on the On-Line Trello platform.
- The criteria for participation and for access to the on-line platform are not clearly defined.
- Managing and controlling the store is essential for the safety of the build but we have no fixed team of people taking responsibility for it.
- Managing the control of expenses and cash is essential for the safety of the project: we have effective follow-up of the expenses made thanks to the data integration managed by Vanessa Solano. We are starting to have a cash box with funds available on the site under the responsibility of V.Maini and S.Sanz.
- We have companies willing to donate insulation materials for the roof (Foamglass) , waterproofing for the façades and the pitched roof (Solitex from Germans Verdaguer) and finishes for the Greb and rammed earth walls ( Livos Keim and ComCal)
Indice de decisiones elaboradas en eventos de esta fase
Index of the decisions worked out at the events of this phase
- Eventos y encuentros del més de Mayo: suministro estructura de escalera y debate sobre su colocación finalpruebas con grafitis de musgo para eventual ejecución revestimiento de fachada definición de temas a ensayar en muro Greb- diseño módulos de ensayo posibilidad actividades futuras de carácter internacional
- Events and meetings in the month of May: delivery of the stair structure and debate about its final placementtests with moss graffiti for a possible façade finish definition of the topics to be tested on the Greb wall- design of the test modules possibility of future activities of an international character
- Eventos y encuentros del més de Junio: decisión mantener luz cenital en cubierta planadiseño revestimiento muro de cal y cañamo. reducción de superficie de estructura metálica a montar.elección solución constructiva cubierta plana ventiladamodificación alzado de proyectodebate cerramientos fachada muro greb
- Events and meetings in the month of June: decision to keep the skylight in the flat roofdesign of the finish for the lime and hemp wall. reduction of the area of metal structure to be assembled.choice of the construction solution for the ventilated flat roofchange to the project elevationdebate on the façade enclosures of the greb wall
- Eventos y encuentros del més de Julio:diseño de acabado de muro de tapial conjuntante a Casal dÍnfants y empresas Chroma y ComCaldebate opciones soluciones de materiales para pavimentación interiorre-diseño mural de muro cal y cañamo en consecuencia de relación con criterios de respeto de los murales de los grafiterospresentación de solicitud de subvención al ayuntamientose descarta definitivamente idea inicial de revestimiento de cubierta de caña con morteros de cal y cañamo
- Events and meetings in the month of July:design of the finish for the rammed earth wall together with Casal dÍnfants and the companies Chroma and ComCaldebate on the options for flooring material solutions for the interiorre-design of the mural on the lime and hemp wall as a result of the relationship with the criteria of respect for the graffiti writers' muralssubmission of the grant application to the Ajuntamentthe initial idea of finishing the cane roof with lime and hemp mortars is definitively dropped