BioBuilding
BioBuilding
Fase 3. Marzo 2014 Abril 2014
Phase 3. March 2014 April 2014
En esta fase el proyecto se concreta el trabajo realizado en fase anterior. Se consiguen ejecutar los tres muros previstos . Los pasos y elementos significativos del proceso realizado en esta etapa son:
In this phase the project makes concrete the work carried out in the previous phase. The three planned walls are built . The significant steps and elements of the process carried out at this stage are:
- Intenso uso de la plataforma on-line trello
- Tensiones entre canales de comunicación - trello y whatsapp
- Formalización de carteles para anuncio de actividades
- Intense use of the on-line platform trello
- Tensions between communication channels - trello and whatsapp
- Formalisation of posters for announcing activities
- Ejecución del muro de tapial, greb y cal y cañamo
- Construction of the rammed earth, greb and lime-and-hemp wall
- Integración de actividades culturales en eventos de auto-construcción
- Integración de participantes y energías al proceso de ejecución de la obra gracias a actividades lúdico-culturales llevadas a cabo
- Inicio colaboración con estudiantes UPC que realizan su tesis final de master
- Integration of cultural activities into self-build events
- Integration of participants and energies into the process of carrying out the build thanks to the recreational-cultural activities held
- Start of collaboration with UPC students doing their final master's thesis
La situación del proyecto en el momento de iniciar esta fase se puede definir como resultados de los eventos y procesos acontecidos en la fase anterior.
The situation of the project at the moment of starting this phase can be defined as the results of the events and processes that took place in the previous phase.
En el més de Marzo sabemos que:
In the month of March we know that:
- El crowdfunding ha superado las expectativas y se han conseguido 10.000€ de apoyo . Ha sido posible superar las expectativa gran medida gracias a la implicación directa del entorno de la familia de Txema de Miguel. De esta cantidad habrá que descontar el % de la comisión cobrada por la plataforma de crowdfunding Goteo
- The crowdfunding has exceeded expectations and 10,000€ of support has been raised . It was possible to exceed expectations largely thanks to the direct involvement of the circle around Txema de Miguel's family. From this amount the % of the commission charged by the crowdfunding platform Goteo will have to be deducted
- Las personas y asociaciones que presentaron su carta de compromiso con el proyecto tienen dificultades prácticas a la hora de participar a los eventos previstos y/o solucionar en autonomia y en tiempos previstos las propuestas de proyecto y/o las tareas delegadas/asignadas.
- Se ha comprobado que no hay posibilidad de ejecutar el diseño previsto en los tiempos previstos a pesar de disponer de los materiales
- Se han conseguido realizar presentaciones colectivas del proyecto y se ha generado el programa del primer evento organizado entre diferentes entidades y personas
- Se ha decidido modificar el diseño reduciendo la carga prevista en autoconstrucción de estructuras de cubierta.
- Se ha tenido que adquirir la tierra para la ejecución del muro de tapial.
- The people and associations that submitted their letter of commitment to the project have practical difficulties when it comes to taking part in the planned events and/or resolving on their own and within the expected time the project proposals and/or the delegated/assigned tasks.
- It has been confirmed that there is no possibility of building the planned design within the planned time despite having the materials available
- Collective presentations of the project have been achieved and the programme of the first event organised between different organisations and people has been generated
- It has been decided to modify the design, reducing the planned self-build load of roof structures.
- The earth for building the rammed earth wall has had to be bought.
Indice de decisiones elaboradas en eventos de esta fase
Index of decisions worked out at the events of this phase
- 01-Estructuras Escondidas: ejecución de encofrado para tapial en base a materiales disponibles, se descarta y modifica diseño inicialejecución de entramado estructural para Muro Greb según diseño inicial aunque haya modificación de diseño de cubierta previsto
- 01-Estructuras Escondidas: construction of the formwork for rammed earth based on available materials, the initial design is discarded and modified construction of the structural framing for the Greb Wall according to the initial design even though there is a planned modification of the roof design
- 02- Som-Hi Celebrem la Primavera: definición de acabados de muros greb : exterior con Daitonite de Diasen, interior con paneles prefabricados de tierra prensada de Ecoclay definición acabados de muro tapial : exterior estucado de cal, interior vistodebates acerca de terminación superior de muros: tapial con planchas de acero recicladas provenientes de tipografía
- 02- Som-Hi Celebrem la Primavera: definition of the finishes of the greb walls : exterior with Daitonite by Diasen, interior with prefabricated pressed earth panels by Ecoclay definition of the finishes of the rammed earth wall : exterior lime stucco, interior exposeddebates about the top finishing of the walls: rammed earth with recycled steel plates coming from a printworks
- 03- Palla Greb:modificación alzado previsto para muro de Greb: se deja parte superior del muro sin ejecutar, se decide mantener parte superior transparente
- 03- Palla Greb:modification of the planned elevation for the Greb wall: the upper part of the wall is left unbuilt, it is decided to keep the upper part transparent
- 04-Pou Repaso:se presenta modificación alzado y cubiertas
- 04-Pou Repaso:the modification of the elevation and roofs is presented
- 05 - Tapial: se modifica dimensión final del Tapial
- 05 - Tapial: the final dimension of the Tapial is modified
- 06- Fiesta Final Tapila inicio Muro Cañamo:se define estructura de soporte muro de cañamo en base a material disponible : reutilización elementos desoporte vertical de encofrado de tapial
- 06- Fiesta Final Tapila inicio Muro Cañamo:the support structure of the hemp wall is defined on the basis of the available material : reuse of the vertical support elements of the rammed earth formwork
- 07- Fiesta Final Tapial inicio Muro Cañamo:se decide modificar posición de muro de cal y cañamo para garantizar mayor flexibilidad en posibilidades de ejecución de estructura de cubierta y fachada en vista de la posible dificultad de realizar el 4º modulo de muro de fachada previsto (fachada verde)
- 07- Fiesta Final Tapial inicio Muro Cañamo:it is decided to modify the position of the lime-and-hemp wall to guarantee greater flexibility in the possibilities of building the roof and façade structure, in view of the possible difficulty of carrying out the planned 4th façade wall module (green façade)